RU

How to Import Spirit Levels from China: A Buyer’s Checklist

Most first orders go wrong in the same few places. This is the checklist we would give a buyer before they place a container.

1. Before you ask for a quote

  • Decide the lengths, vial configuration and whether you want magnets
  • Decide the packaging: bulk, blister card or colour box
  • Know roughly what volume you are talking about — it changes the price
  • If you want your own brand, have the artwork and colour reference ready

2. What landed cost actually contains

Unit price is the smallest part of the decision. Landed cost is what you actually pay to get one level onto your shelf, and it has five parts:

  • Unit price — what the factory quotes
  • Inland freight and export handling — usually inside an FOB price, outside an EXW price
  • Ocean freight — priced per container, so it is shared across every piece in that container
  • Duty and import VAT — depends on your country and the HS code your broker uses
  • Domestic delivery and warehousing — small, but not zero

The part most buyers get wrong is ocean freight, because they divide it by the wrong number of pieces.

Here is a real example from our own carton data. Two lengths, same carton size, same loading count in a 40HQ:

SizePcs / CartonCarton (cm)Cartons in 40HQTotal pieces in 40HQ
30 cm6062 × 30 × 221,60096,000
60 cm3062 × 30 × 221,60048,000
100 cm30102 × 30 × 2296028,800

The container holds the same number of cartons at 30 cm and 60 cm, but half the pieces. At 100 cm you lose both cartons and pieces. If a 40HQ costs the same in all three cases, the freight per piece at 30 cm is roughly a third of the freight per piece at 100 cm.

That is why a quote that compares only unit price, without carton data, can lead you to the more expensive supplier. Always ask for pieces per carton, carton dimensions and carton weight, then do the freight maths yourself.

We publish all of this on our packing and shipping page, so you can work out landed cost before you contact anyone.

3. What a proper quotation should contain

A quotation that only lists a unit price is not enough to make a decision. Ask for:

  • Unit price per model, at your quantity
  • MOQ per model, and whether you can mix models
  • Pieces per carton
  • Carton dimensions and gross weight
  • Lead time from order confirmation
  • Payment terms
  • Whether tooling is needed, who pays for it and who owns it

Pieces per carton plus carton weight and dimensions is what lets you calculate container loading and freight. Without it you cannot compare two suppliers properly.

4. Samples

Order a sample before a bulk order. Expect one to two weeks once artwork and colour are confirmed.

Ask whether the sample charge is deducted from the bulk order — many factories do this.

Check the sample properly: bubble response, frame stiffness, vial alignment and the reversal test described in our accuracy guide.

5. Carton and container data

Ask the supplier for the loading quantity for a 20GP and a 40HQ. A supplier who ships regularly will have these numbers to hand.

Check that the carton dimensions they quote match the ones they actually ship. Inconsistency here is a warning sign.

6. Payment terms

Terms vary by supplier, order size and how long you have worked together. Common arrangements include a deposit with the balance against the bill of lading, or full payment before shipment for small orders.

Never pay the full amount to a supplier you have not ordered from before without some form of protection.

7. Inspection

You are entitled to inspect before shipment. Options:

  • Third-party inspection — SGS, BV, Intertek or similar. You get an independent report.
  • Your own QC team — usually the most reliable if you have someone in the region.
  • Supplier’s own report — useful, but it is not independent.

Agree the inspection before production starts, not after. It is much harder to fix a problem once the goods are in a container.

8. Shipping documents

A standard shipment will include a commercial invoice, packing list, bill of lading and certificate of origin. If your country requires specific certification for imported tools, confirm it with your customs broker before ordering — not after.

9. After arrival

  • Check carton count against the packing list before signing anything
  • Open and inspect a sample of cartons, not just the first one
  • Test a few levels with the reversal test
  • Feed back what you find — a supplier who ships again wants to know

10. Incoterms: what you are actually agreeing to

The three-letter code on the quote decides who pays for what, and where your risk starts. These are the four you will meet most often buying tools from China:

TermSupplier paysYou pay fromGood for
EXWEverything up to their factory doorTheir factoryBuyers with their own China agent
FOBInland freight, export clearance, loadingThe port of loadingMost first orders
CIFFOB plus ocean freight and insuranceThe destination portBuyers without a forwarder
DDPEverything to your door, duty includedYour warehouseBuyers who want one number

FOB is the most common choice for a first container because it separates the goods from the freight — you can compare two suppliers on the same basis, and use your own forwarder.

Two things to watch. First, CIF does not mean the supplier handles your import clearance; you still pay duty, VAT and destination charges. Second, DDP quotes can hide a large margin in the freight — ask for the FOB price as well so you can see both.

11. A realistic timeline

This is a typical sequence for a first order. It assumes artwork and colour are already agreed; if they are not, add the time it takes to sign those off.

StageTypical durationWhat can go wrong
Quote and specification agreed1–2 weeksVague specs, so the quote is not comparable
Sample produced and shipped2–3 weeksArtwork changes restart the sample
Sample approved, deposit paid2–3 daysDeposit sent to the wrong account — verify first
Production3–5 weeksPeak season, holidays, material shortages
Inspection1–3 daysBooked too late, so it delays the container
Shipping to destination port3–6 weeksPort congestion, blank sailings
Import clearance and delivery1–2 weeksMissing documents, duty queries

So a first order realistically takes two to four months from first enquiry to stock on your shelf. Working with a supplier you already know is faster because the sample and specification stages are already settled.

Common mistakes

  • Comparing unit prices without comparing carton data, so freight is never accounted for
  • Skipping the sample to save two weeks
  • Printing an accuracy figure on the packaging that the goods cannot defend
  • Ordering one length instead of a range
  • Leaving inspection until after shipment
  • Paying a deposit without confirming the account details by a second channel

Supplier red flags

None of these is proof of a bad supplier. Each one is a reason to ask a follow-up question before you send money.

  • Carton data that does not add up — dimensions that would not fit the pieces they claim, or weights that are clearly wrong. Carton data is the easiest thing to fabricate and the easiest to check.
  • A price far below everyone else — either the specification is different from what you think you are comparing, or something is missing from the carton.
  • No answer on accuracy method — a supplier who cannot explain how they check vial alignment is not checking it.
  • Reluctance to send a sample — there are legitimate reasons to charge for a sample, but refusing outright is a signal.
  • Pressure to pay to a different company name — the bank account name should match the company you are dealing with. If it does not, stop and verify.

Two questions that come up every time

Do you handle the import clearance?

No. Import clearance, duty and local delivery are arranged by you or your forwarder. What we handle is production, packing, export clearance and loading. If you do not have a forwarder, we can work with one you nominate — but the contract stays with you.

What if the goods arrive damaged?

Photograph the damage before you sign for the delivery, and keep the cartons. Damage in transit is normally a claim against the carrier and your cargo insurance, not against the factory — which is one reason to check the coverage amount on a CIF shipment, not just whether cover exists.

Start Here

We publish carton, weight and MOQ data for every model on this site, so you can work out your landed cost before you contact us.

Questions Buyers Ask

What is the minimum order?

It depends on the supplier and the model. On our own range the MOQ is 20 cartons per model. One order can cover several models, each at 20 cartons minimum.

Can I mix models in a single order?

Yes, at most factories including ours. Mixing models is normal for a first order, because it lets you test several price points without committing to a full container of one item.

How long does shipping take?

It depends on the port, the service and the season, so we confirm it when we quote rather than quoting a number that may not hold.

Get a Quote Within 24 Hours

Tell us three things and we will come back with pricing, carton data and loading details.

1

What you need

The models, the sizes and roughly how many pieces.

2

Where it is going

Your target market, so we quote the right specification.

3

Your own brand?

Any body colour, UV-printed logo and your own packaging.

  • MOQ 20 cartons per model
  • Carton, weight and container loading data published for every model
  • Samples available before you commit
  • SGS, BV or your own QC team welcome before shipment